Tuesday, October 6, 2009

Used 47.3 MW Combined Cycle Cogeneration Plant

USED 47.3 MW COMBINED CYCLE COGENERATION PLANT.

PLANT CONSISTS OF A GE LM6000PA GAS TURBINE, HEAT RECOVERY STEAM GENERATOR WITH BACK-PRESSURE TURBINE, AND CONDENSATION TURBINE WHICH REGULATED LOW PRESSURE. BUILT IN 1996.

GAS TURBINE: GENERAL ELECTRIC LM6000PA, 39 MW, NATURAL GAS FUEL, MARK V CONTROL, YEAR 1998. GAS GENERATOR: GEC ALSTHOM 48.76 MVA. 11 KV, 50 HZ. YEAR 1996.

HEAT RECOVERY STEAM GENERATOR: WITHOUT POST COMBUSTION. 52 BAR AT 440°C (44 TON/H), 4 BAR AT 188°C (13 TON/H). 35M BY-PASS STACK WITH HYDRAULIC SYSTEM. YEAR 1996.

BACK PRESSURE STEAM TURBINE: SIEMENS T-5452, 4.5 MW, 6 KV, 50 HZ, INLET PRESSURE 52 BAR AT 440°C - OUTLET 4 BAR, (44 TON/H).

CONDENSING STEAM TURBINE: ALLEN S22-630, 3.8 MW, 11 KV, 50 HZ, INLET PRESSURE 4 BAR AT 188°C (34 TON/H). YEAR 1995.

ASSOCIATED AUXILIARY EQUIPMENT ALSO INCLUDED.

FOR FURTHER DETAILS CONTACT
Rod Caro
(North & South America)
+1.609.288.4059
rcaro@perryvidex.com